Aim Texas
  • Home
  • About
  • Services
    • Water & Environment
    • Planning & Economics
    • GIS & IT
    • Industry & Energy
    • Project Development
    • Engineering & Supervising
    • Inspection & Assessment
    • Master Planning
    • Marine & Coastal Engineering
    • Air & Land Transport Network
  • Policy
  • News & Projects
  • Career
  • Contact Us
Aim Texas
  • Home
  • About
  • Services
    • Water & Environment
    • Planning & Economics
    • GIS & IT
    • Industry & Energy
    • Project Development
    • Engineering & Supervising
    • Inspection & Assessment
    • Master Planning
    • Marine & Coastal Engineering
    • Air & Land Transport Network
  • Policy
  • News & Projects
  • Career
  • Contact Us

Blog

June 10, 2021

By: admin

Ankara, Turkey, June 10, 2021

Aim Texas Overseas Management Group (AIMOMG) has attended a tender in joint venture with Erbil Project Consulting (Turkey), whereas Aim Texas is Lead Consultant in providing consulting Services for Consultancy Services for Design Review, Preparation of Bidding Documents and Construction Supervision Services for Gaziantep Mechanical Biological Treatment and Biogas Production Plant – Capacity Increase (2nd Stage), CHP unit and RDF production unit, Nizip Solid Waste Landfill (3rd Stage), Mechanical Recycling and RDF production unit and Rehabilitation of Dump sites and Şanlıurfa Viranşehir-Ceylanpınar Integrated Solid Waste Management Project (AFD2-C1)

ILBANK of Turkey has applied for a financing from Agence Française de Développement (“AFD”) and intends to use part of the funds thereof for payments under the following project Municipal Services Project II.

The Services of the consultant shall consist of design review, preparation of bidding documents, technical assistance during the bidding stage, and works supervision during construction stage and defects liability period (DLP) services for the following solid waste Sub-project investments.

  1. Gaziantep MBT and Biogas Production Facility-Capacity Increase (2nd Stage),
  2. Gaziantep Nizip Solid Waste Landfill (3rd Stage), mechanical recycling and RDF production unit and Rehabilitation of Dump Sites,
  3. Şanlıurfa – Viranşehir – Ceylanpınar Integrated Solid Waste Management Project.

The Consultant’s Services will be implemented over following two main phases:

  • Phase-1 (Lump-Sum): Depending on the project’s stage, design review, preparation or review of related Employer’s Requirements, Conceptual Design (and/or reviewing available Conceptual design), Preparation of Design & Built Tender Dossiers whose Contract Conditions will be FIDIC, and Technical Assistance during the bidding and evaluation period.
  • Phase-2 (Time Based): Design approval of the Works Contractor in Design and Built Contracts, Supervision of construction works and defects liability period (DLP)

The estimated duration of the Services is seven (7) months for Phase-1 (Preparation of Design & Built Tender dossier including Contract Conditions preparation period is 3 months + Bidding & Evaluation period is 4 months) and thirty-six (36) months for Phase-2 including twelve (12) months of Defects Liability Period (DLP). The total required time input for the Key Experts is estimated at this stage to be 463 person-months. This does not include the required time input from personnel other than the Key Experts.

Location of Services

Phase 1: For the design and procurement stage, substantial presence on site will not be required, provided regular communication is made possible with ILBANK’s representatives (in Ankara) and representatives of the municipalities in coordination with ILBANK’s representatives. However, site visits (in Gaziantep, Nizip and Şanlıurfa Cities) will be required from the beginning, and especially during preparation of design & built tender dossiers.

Phase 2: Substantial presence will be required on site. The location of Phase 2 services will be mainly within the region of Gaziantep, Nizip and Şanlıurfa Cities and around.

Gaziantep has population around 2,069,000 by 2019, which is located  in the westernmost part of Turkey’s Southeastern Anatolia Region. Nizip is the largest surrounding district of Gaziantep with a population around 150,000, and located 45 km from the city of Gaziantep easterly.

Şanlıurfa is a city with a population of over 2 million residents in southeastern Turkey, and the capital of Şanlıurfa Province.

The Gaziantep Metropolitan Municipality (GMM) plans to implement the second stage of Mechanical Biological Treatment & Biogas Production Plant. The project area covers 7 of 9 districts of GMM serving a total of 1.876 million inhabitant plus 375 thousand Syrians refugees. The landfill in Gaziantep center now receives more than 500,000 tons of waste per year from 7 of 9 districts of GMM, waste from the remaining 2 districts being sent to Nizip landfill. The project aims to:

  1. Increase the capacity of its current mechanical-biological sorting equipment – from 100,000 t/anuum to 300,000 t/annum, (i.e. additional equipment of 200,000 t/annum).
  2. Build a RDF (Refuse Derived Fuel) production unit – with a capacity of around 50,000 t/annum.
  3. Increase the capacity of biomethanization unit (anaerobic digestion) & install CHP (combined heat and power) unit, capable of treating 110,000 t/annum of organic waste and produce renewable energy.

This project will make it possible to produce 33.5 thousand t/annum of the recycled waste, 52.6 thousand t/annum of RDF, and 20,251 MWh per year of renewable energy.

Posted in Uncategorized
Previous Post
Next Post

  • June 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • May 2022
  • December 2021
  • September 2021
  • August 2021
  • June 2021
  • May 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • February 2018
  • December 2017
  • November 2017
  • October 2017
  • August 2017
  • April 2017
  • November 2016
  • October 2016
  • September 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • December 2014
  • October 2014
  • September 2014
  • August 2014
  • June 2014
  • January 2014
  • November 2013
  • August 2013
  • July 2013
  • May 2013
  • January 2013
  • December 2012
  • October 2012
  • August 2012
  • June 2012
  • May 2012
  • April 2012

“Aim Texas Trading, LLC”

Head Office
Dallas, TX, USA | [email protected]

  • Home
  • About Us
  • News & Projects
  • Services
  • Policy
  • Contact Us

FIELDS OF ACTIVITIES

  • Waste Management
  • Water Supply & Wastewater
  • Master Planning, Architecture
  • Transport Network Development
  • Agro-business & Irrigation
Aim Texas © 2025 All Rights Reserved.

Search